Lahan – Pondasi – Struktur – Arsitektur – Mekanikal – Plumbing – Elektrikal
NO. | URAIAN PEKERJAAN | SATUAN | HARGA SATUAN | |||
A. | PEKERJAAN PERSIAPAN | |||||
1 | Pek. Pembersihan Lahan | m2 | 9.438,00 | |||
2 | Pengukuran lahan dan pemasangan bouwplank | m’ | 27.434,00 | |||
B. | PEKERJAAN FONDASI/ STRUKTUR BAWAH | |||||
1 | Pek. Galian Tanah | m3 | 36.322,00 | |||
2 | Pekerjaan Pile Cap/ Footplate Penahan Rumah Kayu | |||||
– Bekisting | m2 | 107.646,00 | ||||
– Besi | kg | 16.565,00 | ||||
– Beton Adukan 1:3:5 | m3 | 978.582,00 | ||||
3 | Pekerjaan Pile Cap/ Footplate Tipe B | |||||
– Bekisting | m2 | 107.646,00 | ||||
– Besi | kg | 16.565,00 | ||||
– Beton Adukan 1:3:5 | m3 | 978.582,00 | ||||
4 | Pek. Fondasi Batu Kali menerus Pas. 1SP:4PP | m3 | 918.896,00 | |||
5 | Pek. Urugan Tanah Kembali | m3 | 54.494,00 | |||
6 | Pek. Pemadatan | m3 | 78.705,00 | |||
C. | PEKERJAAN STRUKTUR | |||||
1 | Pek. Sloof 200×400 Struktur Rumah Kayu | |||||
– Bekisting | m2 | 107.646,00 | ||||
– Besi | kg | 16.565,00 | ||||
– Beton Adukan 1:3:5 | m3 | 978.582,00 | ||||
2 | Pek. Sloof 150×300 | |||||
– Bekisting | m2 | 107.646,00 | ||||
– Besi | kg | 16.565,00 | ||||
– Beton Adukan 1:3:5 | m3 | 978.582,00 | ||||
3 | Pek. Kolom 200×200 | |||||
– Bekisting | m2 | 204.620,00 | ||||
– Besi | kg | 15.060,00 | ||||
– Beton Adukan 1:3:5 | m3 | 889.620,00 | ||||
4 | Pek. Ring Balok 150×200 | |||||
– Bekisting | m2 | 253.935,00 | ||||
– Besi | kg | 16.566,00 | ||||
– Beton K-300 | m3 | 1.210.165,00 | ||||
5 | Pek. Pelat Lantai T=15 cm Untuk Kamar Mandi | |||||
– Bekisting | m2 | 217.190,00 | ||||
– Besi | kg | 15.060,00 | ||||
– Beton K-300 | m3 | 1.100.150,00 | ||||
D. | PEKERJAAN ARSITEKTUR | |||||
1 | Pek. Dinding Bata Xpose | m2 | 151.338,00 | |||
2 | Pek. Plesteran Adukan 1SP:4PP | m2 | 54.857,00 | |||
3 | Pek. Acian | m2 | 41.998,00 | |||
4 | Pek. Plafond Gypsum dan Rangka Hollow | m2 | 156.200,00 | |||
5 | Pek. List Plafond Gypsum Lebar 8 cm | m’ | 31.009,00 | |||
6 | Pek. Lantai Keramik 50×50 Platinum Havana Grey | m2 | 169.840,00 | |||
7 | Pek. Lantai Keramik 40×40 Asia Tile Oscar Black | m2 | 169.840,00 | |||
8 | Pek. Keramik Dinding Kamar Mandi 25×40 Rizona | m2 | 184.970,00 | |||
9 | Pek. Pintu Utama Kayu Marsawa Full Aksesoris | Lbg | 4.340.000,00 | |||
10 | Pek. Pintu Kamar Mandi Kayu Marsawa Full Aksesoris | Lbg | 1.690.000,00 | |||
11 | Pek. Pintu Kamar Kayu Marsawa Full Aksesoris | Lbg | 1.690.000,00 | |||
12 | Pek. Jendela Kayu Marsawa Full Aksesoris | Lbg | 910.000,00 | |||
13 | Pek. Jendela Bouven KM/WC Kayu Marsawa Full Aksesoris | Lbg | 500.000,00 | |||
14 | Pek. Rooster | m2 | 490.710,00 | |||
15 | Pek. Ban²an Kusen Pintu & Jendela | m2 | 35.000,00 | |||
16 | Pek. Pengecatan Ban²an | m2 | 37.081,00 | |||
17 | Pek. Coating Bata Xpose | m2 | 35.200,00 | |||
18 | Pek. Pengecatan Plafond Cat setara Jotun/ Dulux | m2 | 32.043,00 | |||
E. | PEKERJAAN MEKANIKAL & PLUMBING | |||||
1 | Pek. Closet Duduk TOTO type CW 633 Lengkap | unit | 1.607.350,00 | |||
2 | Pek. Wastafel Dinding TOTO type LW 246 | unit | 607.090,00 | |||
3 | Pek. Kran Air Stainless Bano type Sus 304 | bh | 83.740,00 | |||
4 | Pek. Floor Drain Stainless setara TOTO/ ONDA untuk KM/WC | bh | 57.090,00 | |||
6 | Pek. Instalasi Air Bersih | |||||
– Pipa PVC tipe AW Ø1″ | m’ | 34.510,00 | ||||
– Pipa PVC tipe AW Ø1/2″ | m’ | 26.350,00 | ||||
– Stop Kran PVC Ø1″ untuk sambungan ke PDAM/ Tangki Air | bh | 36.000,00 | ||||
7 | Pek. Instalasi Air Kotor | |||||
– Pipa PVC tipe D Ø3″ | m’ | 60.130,00 | ||||
– Pipa PVC tipe D Ø4″ | m’ | 84.820,00 | ||||
8 | Pek. SafetyTank | |||||
– Galian, Struktur & Finishing | Ls | 5.000.000,00 | ||||
F. | PEKERJAAN ELEKTRIKAL | |||||
1 | Pek. Instalasi Titik Lampu | ttk | 69.575,00 | |||
2 | Pek. Instalasi Titik Saklar dan Stop Kontak | ttk | 69.575,00 | |||
3 | Pek. Instalasi Jaringan AC | ttk | 69.575,00 | |||
4 | Pek. Pemasangan Saklar Tunggal Broco | bh | 44.187,00 | |||
5 | Pek. Pemasangan Stop Kontak Broco | bh | 46.728,00 | |||
6 | Pek. Pemasangan Lampu LED Philiph 10 Watt Lengkap | bh | 112.794,00 | |||
7 | Pek. MCB/ Panel Pembagi Daya 4400 VA/ 16 A Schneider | unit | 401.170,00 | |||
8 | Pek. Pentanahan/ Arde dengan NYA 6 mm | ttk | 502.150,00 | |||
9 | Pek. Instalasi Kabel NYM 2×2,5 mm2 dengan Pipa Conduit untuk Lampu | m’ | 19.950,00 | |||
10 | Pek. Instalasi Kabel NYM 3×2,5 mm2 dengan Pipa Conduit untuk Daya dan AC | m’ | 23.562,00 | |||
G. | PEKERJAAN LAIN – LAIN | |||||
1 | Pek. Pembuatan Pantry | |||||
– Bekisting | m2 | 107.646,00 | ||||
– Besi | kg | 16.565,00 | ||||
– Beton Adukan 1:3:5 | m3 | 978.582,00 | ||||
2 | Pek. Pemasangan Zink Stainless 1 Lubang & Aksesoris P:52xL:43xT:21 | bh | 910.000,00 | |||
3 | Pek. Pemasangan Keramik Meja Dapur | m2 | 169.840,00 | |||
4 | Pek. Pemasangan Keramik Dinding Meja Dapur | m2 | 184.970,00 |